[1] Ching Jong Liao, Chih H siung Shyu. An analytical determination of lead time with normal demand[J]. Int Journal of Operations and Production Management, 1991, 11(9): 201-206.
[2] Ben Daya M, Raouf A. Inventory models involving lead time as decision variable[J]. Journal of the Operational Research Society, 1994, 45(5): 196-204.
[3] Liang Yuh Ouyang, Hung Chi Chang. Lot size reorder point inventory model with controllable lead time and setup cost[J]. Int Journal of Systems Science, 2002, 33(8): 77-81.
[4] Hariga M, Ben Daya M. Some stochastic inventory models with deterministic variable lead time[J]. European Journal of Operational Research, 1999, 113(1): 42-51.
[5] Hariga M, Ben Daya M. Lead time production in a stochastic inventory system with learning consideration[J]. Int Journal of Production Research, 2003, 41(3): 571-579.
[6] John E Tyworth, Ram Ganeshan. Inventory control under gamma demand and random demand[J]. Journal of Business Logistics, 1996, 17(1): 291-304.
[7] Sridhar Bashyam, Michael C F. Optimization of (s, S) inventory systems with random lead times and a service level constraint[J]. Management Science, 1998, 44(12): 243-256.
[8] John E Tyworth, Ram Ganeshan. A note on solutions to the (Q, R) inventory model for gamma lead time demand[J]. Int Journal of Physical Distribution and Logistics Management, 2000, 30(6): 534-539.
[9] Wikner J. Continuous time dynamic modeling of variable lead times[J]. Int Journal of Production Research, 2003, 41(12): 2787-2798.
[10] Sunil Chopra, Gilles Reinhardt, Maqbool Dada. The effect of lead time uncertainty on safety stocks[J]. Decision Sciences, 2004, 34(11): 1-24.
[11] 林勇, 马士华. 基于提前期的通用件安全库存管理[J]. 系统工程, 2003, 21(1): 71-75. Lin Yong, Ma Shihua. A study on safety stock management of component commonality based on lead time[J]. Systems Engineering, 2003, 21(1): 71-75.
[12] 刘蕾, 唐小我. 订货提前期对服务水平决策的影响研究[J]. 控制与决策, 2005, 20(11): 1265-1268. Liu Lei, Tang Xiaowo. Study of the impact of lead time on service level decision[J]. Control and Decision, 2005, 20(11): 1265-1268.
[13] 何桢, 车建国, 崔庆安. 带有单件流的混流生产方式提前期的分析与优化[J]. 管理科学, 2006, 19(1): 2-6. He Zhen, Che Jianguo, Cui Qing'an. Analysis and optimization of lead time of mixed production system with one piece[J]. Management Sciences in China, 2006, 19(1): 2-6.
[14] 杨瑾, 赵嵩正, 王娟茹. 客户化供应链中自制件动态提前期的一种计算方法[J]. 工业工程, 2004, 7(4): 37-40. Yang Jin, Zhao Songzheng, Wang Juanru. Calculating method for dynamic lead-time of homemade parts in customization supply chain[J]. Industrial Engineering Journal, 2004, 7(4): 37-40.
[15] 何桢, 李从东, 刘子先, 等. n/m/F/C排序问题的启发式算法[J]. 系统工程学报, 1996, 11(2): 75-80. He Zhen, Li Congdong, Liu Zixian, et al. A heuristic algorithm for n/m/F/C scheduling problom[J]. Journal of Systems Engineering, 1996, 11(2): 75-80.
[16] 何桢, 齐二石, 王恒毅, 等. 成组流水线上零件排序的优化算法[J]. 管理工程学报, 1996, 10(4): 243-248. He Zhen, Qi Ershi, Wang Hengyi, et al. A heuristic algorithm for job scheduling in a group technology flowline[J]. Journal of Industrial Engineering and Engineering Management, 1996, 10(4): 243-248.
[17] 吴哲辉. Petri网导论[M]. 北京: 机械工业出版社,2006.4.
[18] 崔政东, 刘晋. 基于广义随机Petri 网的供应链建模与分析[J]. 系统工程理论与实践, 2005, 12: 18-24. Cui Zhengdong, Liu Jin. Supply chain modeling and analysis based on generalized stochastic petri nets[J]. Systems Engineering-theory and Practice, 2005, 12: 18-24.
[19] Ballou Ronald H. 企业物流管理——供应链的规划、组织和控制[M]. 北京: 机械工业出版社, 2003. Ballou Ronald H. Business logistics management[M]. : Prentice-Hall Inc, 1999.
[20] 龙士工, 罗文俊. 随机Petri网性能等价化简与分析方法研究[J]. 计算机工程, 2006, 32(12): 27-36. Long Shigong, Luo Wenjun. Study of performance equivalent simplification and analysis of stochastic petri nets[J]. Computer Engineering, 2006, 32(12): 27-36. |