[1] 吴小辰. 南方电网"十二五"电力通信发展规划综述[J]. 电力系统通信, 2011, 32(5):7-9. Wu Xiaochen. Review of power communication development plan of China southern power grid in the twelfth five-year plan period[J]. Telecommunications for Electric Power System, 2011, 32(5):7-9.
[2] Haidine A, Lehnert R. Placement of base stations in broadband power line communications access networks by means of multi-criteria optimization[J]. Social Informatics and Telecommunications Engineering, 2009, 6:176-191.
[3] Silvia Canale, Alessandro Di Giorgio, Andrea Lanna, et al. Optimal planning and routing in medium voltage power line communications networks[J]. IEEE Transcations on Smart Grid, 2013, 4(2):711-719.
[4] Song In-Jee, Cho Sung-Bae. Bayesian and behavior networks for context-adaptive user interface in a ubiquitous home environment[J]. Expert Systems with Applications, 2013, 40(5):1827-1838.
[5] Chen Jiann-Liang, Chen Ming-Chiao, Chian Yi-Ru. QoS management in heterogeneous home networks[J]. Computer Networks, 2007, 51(12):3368-3379.
[6] 郑涛, 潘玉美, 郭昆亚, 等. 基于免疫算法的配电网故障定位方法研究[J]. 电力系统保护与控制, 2014, 42(1):77-83. Zheng Tao, Pan Yumei, Guo Kunya, et al. Fault location of distribution network based on immune algorithm[J]. Power System Protection and Control, 2014, 42(1):77-83. |