[1] 宁维巍, 雷毅, 仲华惟, 等. 无等待排列流水车间提前/延期调度问题[J]. 北京邮电大学学报, 2009, 32(6): 72-76. Ning Weiwei, Lei Yi, Zhong Huawei, et al. Researches on the no-wait permutation flow shop earliness and tardiness scheduling problem[J]. Journal of Beijing University of Posts and Telecommunications, 2009, 32(6): 72-76.[2] Yenisey M M, Yagmahan B. Multi-objective permutation flow shop scheduling problem: literature review, classification and current trends[J]. Omega, 2014, 45(2): 119-135.[3] 曾强, 杨育, 程博, 等. 平顺移动下等量分批FJSP多目标优化研究[J]. 系统仿真学报, 2012, 24(5): 1046-1052. Zeng Qiang, Yang Yu, Cheng Bo, et al. Research on multi-objective optimization for equal batch splitting FJSP under parallel and sequence shift mode[J]. Journal of System Simulation, 2012, 24(5): 1046-1052.[4] 贾国柱, 孔继利. 考虑运输时间的加工装配型企业批量加工模式系统设计[J]. 工业工程, 2013, 16(2): 104-111. Jia Guozhu, Kong Jili. System design of batch processing modes in processing-assembly enterprise with transit time considered[J]. Industrial Engineering Journal, 2013, 16(2): 104-111.[5] 孔继利, 贾国柱, 栾世超, 等. 考虑学习率和搬运时间的人工作业系统批量加工模式研究[J]. 系统工程理论与实践, 2013, 33(8): 1965-1974. Kong Jili, Jia Guozhu, Luan Shichao, et al. Batches processing modes for manual operating system considering learning rate and handling time[J]. Systems Engineering-Theory and Practice, 2013, 33(8): 1965-1974.[6] 孔继利, 贾国柱. 考虑搬运时间的多品种、小批量混流制造系统批量加工模式的优化与资源调度[J]. 系统工程理论与实践, 2014, 34(11): 2801-2807. Kong Jili, Jia Guozhu. Optimization of the batches processing modes and resource scheduling for mixed-model manufacturing system of multi-variety and small-batch considering handling time[J]. Systems Engineering-Theory and Practice, 2014, 34(11): 2801-2807. |