[1] 张俊光. 软件项目管理的若干关键问题研究. 北京: 北京邮电大学, 2007. [2] 万伟, 蔡晨. 在单资源约束项目中的关键链管理[J]. 中国管理科学, 2003, 11(2): 70-75. Wan Wei, Cai Chen. Critical chain PM in single-resource constrained environment[J]. Chinese Journal of Management Science, 2003, 11(2): 70-75. [3] Putnam L H, Myers W. Industrial strength software-effective management using measurement [M]. : IEEE Computer Society Press, 1997. [4] Boehm B W. 软件工程经济学[M]. 赵越, 袁冬林, 马雨生, 译. 北京: 中国铁道出版社,1990. Boehm B W. Software engineering economics[M]. ZhaoYue, Yuan Donglin, Ma Yusheng, Translated. Beijing: China Railway Publishing House, 1990. [5] Zhang Junguang. Method study of software project monitoring and control[J]. Chinese Journal of Management Science, 2006, 14: 127-132. [6] Florac W A, Carleton A D. Measuring the software process: statistical process control for software process improvement[M]. : Addison-Wesley, 1999. [7] Pankaj Jalote. Software project management practice[M]. Beijing: Tsinghua University Press, 2003. [8] Verner J M, Evanco W M, Cerpa N. State of the practice: an exploratory analysis of schedule estimation and software project success prediction [J]. Information and Software Technology, 2007, 49(2): 181-193. [9] Willy Herroelen, Roel Leus. On the merits and pitfalls of critical chain scheduling[J]. Journal of Operations Management, 2001, 19: 559-577. [10] Walston C E. A method of programming measurement and estimation[J]. IBM Systems Journal, 1997, 16(1): 54-73. [11] Dolado J J. On the problem of the software cost function[J]. Information and Software Technology, 2001, 43: 61-72. |