Journal of Beijing University of Posts and Telecommunications

  • EI核心期刊

JOURNAL OF BEIJING UNIVERSITY OF POSTS AND TELECOM ›› 2013, Vol. 36 ›› Issue (3): 113-116.doi: 10.13190/jbupt.201303.116.zhangl

• Reports • Previous Articles    

Outsourcing Resource Selection Model

ZHANG Li1,2, FENG Ding-zhong2   

  1. 1. School of Mechanical Engineering, Taizhou University, Zhejiang Taizhou 318000, China;
    2. College of Mechanical Engineering, Zhejiang University of Technology, Hangzhou 310014, China
  • Received:2012-01-10 Online:2013-06-30 Published:2013-06-30

Abstract:

To integrate quality, cost and time of project development in multi-outsourcing resources selection, a quality/cost/time trade off model used for optimal scheduling of product planning was presented based on set pair analysis. Modified aho-corasick algorithm based on compressed matrix was used to solve the optimization model, and the optimal product quality/cost/time control concept alternative was obtained, and reasonable outsourcing resources was selected for each component. Finally, three needle lockstitch sewing’s quality/cost/time control process case was evaluated, based on which each component’s outsourcing resources was identified. The result shows the validity of the proposed method.

Key words: set pair analysis, modified aho-corasick algorithm, quality/cost/ time, outsourcing resources selection

CLC Number: